To find out what user content may be impacted by the metric reduction, run the Pre-Upgrade Readiness Assessment Tool before upgrading to vRealize Operations Manager 7.5.
- Download the Pre-Upgrade Readiness Assessment Tool available at VMware Downloads.
- Log in to the primary node vRealize Operations Manager Administrator interface of your cluster at https://master-node-FQDN-or-IP-address/admin.
- Click Software Update in the left panel.
- Click Install a Software Update in the main panel.
- Follow the steps in the wizard to locate and install your PAK file.
Note: Check Install the PAK file even if it is already installed.
- Install the Pre-Upgrade Readiness Assessment Tool.
- Wait for the software update to complete.
Note: If a cluster fails and the status changes to offline during the installation process of a PAK file update then some nodes become unavailable. To fix this, you can access the Administrator interface and manually take the cluster offline and click Finish Installation to continue the installation process.
- Navigate to the Support > Support Bundles tab.
- Download the light support bundle that was generated from the installation of the Pre-Upgrade Readiness Assessment Tool.
- In the downloaded support bundle, open the cluster_timestamp_nodeaddress/nodeaddress_timestamp_nodeaddress/apuat-data/report/index.html file.
- A list of all potentially impacted user content is displayed in the Impacted Components Summary page.