If you have vRealize Suite 6 and on active SnS, you are entitled to the following:
vRealize Suite 6.0 Advanced (CPU)
You are entitled for and will be fulfilled with:
- vRealize Suite 7.0 Advanced (PLU)
- vRealize Business Enterprise (CPU)
vRealize Suite 6.0 Advanced (25 OSI bundle)
You are entitled to and will be fulfilled with:
- vRealize Suite 7 Advanced (2 PLU)
- vRealize Business Enterprise (25 OSI bundle)
vRealize Suite 6.0 Enterprise (CPU)
You are entitled to and will be fulfilled with:
- vRealize Suite 7.0 Enterprise (PLU)
- vRealize Business Enterprise (CPU)
- vRealize Configuration Manager (CPU)
vRealize Suite 6.0 Enterprise (25 OSI bundle)
You are entitled to and will be fulfilled with:
- vRealize Suite 7.0 Enterprise (3 PLUs)
- vRealize Business Enterprise (25 OSI bundle)
- vRealize Configuration Manager (25 OSI bundle)
Note: Portable licensing Unit (PLU) allows usage of vRealize Suite to manage unlimited operating system instances (OSI) deployed on on-premise vSphere CPU or up to 15 OSIs deployed on the public cloud including VMware vCloud Air, vCloud Air Network Partners, other supported public clouds, as well as third-party hypervisors and physical servers.
Each vRealize Suite 7 PLU entitles to 1 CPU or 15 OSI of VMware vRealize Log Insight.
Due to new Packaging of the vRealize Suite 7 Product family all existing vRealize Suite 6 customers are being fulfilled with separate keys for existing functionality (i.e. vRealize Business Enterprise & vRealize Configuration Manager). For these components the prior licensing mechanism (Per CPU OR Per OSI) is being preserved.
Note on the Upgrade Process:
vRealize Suite 6 consists of the following components which currently have separate keys in the license portal in Customer Connect:
vRealize Suite 6.0 Advanced
- VMware vRealize Operations 6 Advanced
- VMware vRealize Automation 7 Advanced
- VMware vRealize Business 8 Advanced
- VMware vRealize Log Insight 3
vRealize Suite 6 Enterprise
- VMware vRealize Operations 6 Enterprise
- VMware vRealize Automation 7 Enterprise
- VMware vRealize Business 8 Enterprise
- VMware vRealize Log Insight 3
Only vRealize Operations 6 show as available to upgrade to the new vRealize Suite 7 in Customer Connect. The remaining products of vRealize Suite 6 are removed from the portal after performing the upgrade to vRealize Suite 7. The new vRealize Suite 7 key enables all of the functionality in the individual components.
You must have access and upgrade permission for all components of the vRealize Suite 6 to perform the upgrade. For more Information about specific product upgrade scenarios, see
Explaining messages received during the license key upgrade processes in the Customer Connect portal (2124880)